One of the most common questions property owners ask is not just whether they need a soil report, but who is actually requiring it. Is it the city? The structural engineer? The Ontario Building Code? The designer? Someone else? That confusion is completely understandable, because geotechnical reports often become important at the point where several different people are involved in the same project.
That is why this page matters. In many cases, the owner is not really asking for a textbook answer. They are trying to understand something much more practical:
“Who is driving this requirement, and do I really need to deal with it now?”
The short answer is that a soil report in Ontario may be required, requested, or strongly recommended by more than one party. The municipality may want it for permit review. The structural engineer may need it to support footing or foundation assumptions. The designer may need it to coordinate the project properly. In some cases, another approving body may also be involved. So the honest answer is often not “the city” or “the engineer” alone. It is a combination of project risk, site conditions, and who is responsible for what part of the process.
This guide explains who may require a soil report in Ontario, why they ask for it, how the Ontario Building Code fits into the picture, why the report may come up at different stages, and why waiting to see who asks first is often not the most efficient strategy.
Written for Ontario projects by Jaspreet Singh, P.Eng.
Request a Soil Report Quote View Services
A soil report in Ontario may be required, requested, or strongly recommended by:
The important point is that the report is often not “owned” by just one party. Different people may need the same geotechnical information for different reasons.
Owners often ask:
“Who requires the soil report?”
That is a fair question. But the deeper and more useful question is:
“Why does this project depend on geotechnical information in the first place?”
That is the real issue.
A soil report is usually not requested just because someone likes extra paperwork. It comes up because the project depends on actual conditions below grade. Once a design relies on support assumptions, bearing conditions, fill, drainage, groundwater, slope behavior, or excavation risk, someone in the project chain usually needs more confidence than generic assumptions can provide.
That is why the report can be requested by multiple people at different stages. They may be looking at different aspects of the same underlying issue: uncertainty below grade.
A lot of confusion happens because owners expect one simple rule, such as:
In reality, geotechnical reports sit at the intersection of:
That means the answer often depends on both the project and the role of the person reviewing it. The same report may matter to one party for permit reasons and to another for design reasons.
The municipality is one of the most common reasons owners hear about a soil report. During permit review, the city may ask for geotechnical information when the submitted drawings depend on support assumptions that are not adequately justified.
This often comes up on projects involving:
The key point is that the city does not automatically require a soil report for every permit application. But when the design depends on real site conditions that are uncertain, the municipality may ask:
In those situations, the soil report becomes the practical way to answer the reviewer’s concerns.
In many projects, the structural engineer is actually the first person to raise the issue.
That happens because the structural design often depends on assumptions such as:
So yes — a structural engineer can effectively require a soil report even if the city has not explicitly asked for one yet.
That does not mean the engineer is being overly cautious. It usually means the engineer does not want to finalize design assumptions without a better basis for them.
This is especially common on:
Sometimes the report comes up even before structural review or municipal comments. A designer or architect may recommend geotechnical input early because they can already see that the project depends on site-specific conditions.
This is often the smartest point to deal with it, because the report can then help shape the project before assumptions are locked in.
A good designer may want geotechnical input early in order to:
In practice, this often saves time instead of adding delay.
A lot of owners assume the Ontario Building Code either clearly requires a soil report or clearly does not. The reality is more nuanced.
The Code does not mean that every project automatically needs a formal geotechnical report. But it does mean that foundations and related support assumptions still need to be appropriate for the actual site conditions.
That is a crucial difference.
So while the Building Code may not say “submit a soil report for every project,” it absolutely supports the principle that:
That is why people sometimes say “the code requires it” when what they really mean is:
“The design must comply with code expectations, and the practical way to support that on this site is with a geotechnical report.”
Related reading: Ontario Building Code soil and foundation requirements
Depending on the site, other bodies may also be involved. For example, geotechnical input may become important where:
The point is not that every project will involve extra reviewers. The point is that the further a site moves away from a simple, straightforward condition, the more likely it becomes that geotechnical information is needed by more than one party.
A common misunderstanding is that only one person “owns” the need for the report. In reality, the same geotechnical report may serve different purposes for different people:
That is why asking “who requires it?” is often only the first step. The better takeaway is that the report may be valuable to several parties even if only one of them formally asks for it.
If you misunderstand who requires the report, it can lead to a common mistake:
waiting for the wrong person to ask first.
For example:
That is why understanding the roles matters. The report is often most useful when handled early, not when it is forced into the schedule after multiple people have already progressed too far without it.
The following types of projects are among the most likely to lead to geotechnical requests from the city, engineer, designer, or another reviewer:
Related reading: Can I build without a soil report in Ontario?
When nobody deals with geotechnical issues early, the project often follows a pattern like this:
This is why waiting to see who asks first often turns out to be the wrong strategy. It treats the report as a reaction to a problem instead of as an input that could have reduced the problem from the start.
You can. But that does not usually make it the best approach.
Waiting may seem efficient if:
But if the project clearly depends on site-specific geotechnical conditions, waiting often causes:
Related reading: How long does a soil report take in Ontario? and what happens during a geotechnical investigation?
A useful way to simplify the issue is this:
So instead of asking only:
“Who requires the report?”
Ask:
“Does this project depend on site-specific conditions enough that someone responsible for design or approval is likely to need geotechnical support?”
That usually leads to a more realistic decision.
Related reading: Geotechnical investigation costs in Ontario
This confusion comes up constantly on residential and site projects across Ontario, especially in municipalities where owners are trying to move quickly through design and permits. It is common on projects in Toronto, Mississauga, Brampton, Vaughan, Markham, Oakville, and across Ontario wherever the site conditions are less straightforward than they first appear.
You should strongly consider dealing with the soil report early if:
In those cases, the safest and most efficient approach is often to address the geotechnical side proactively.
So, who requires a soil report in Ontario — the city, the engineer, or the Building Code?
The honest answer is that it can be any of them, and often more than one of them in different ways.
The municipality may require it for permit review. The structural engineer may need it to support the design. The Building Code may not explicitly require a report for every project, but it still requires that foundation and support assumptions be appropriate for actual site conditions. And the broader project team may know early on that the job depends too heavily on uncertain subsurface conditions to proceed comfortably without geotechnical input.
That is why the best approach is usually not to wait and see who asks first. It is to identify early whether the project depends on site-specific geotechnical assumptions and address the soil report before uncertainty turns into delay.
Get a Quote View Services Find Your City
A soil report may be requested by the municipality, structural engineer, architect or designer, conservation authority in some situations, or another reviewer involved in the project. In practice, more than one party may need the same geotechnical information for different reasons.
No. Municipalities do not automatically require a soil report for every project. They are more likely to ask for one when the permit drawings depend on site-specific support, bearing, drainage, slope, or soil assumptions that are not otherwise confirmed.
Yes. A structural engineer may request geotechnical input before finalizing design assumptions if the project depends on footing support, fill conditions, groundwater, excavation issues, or other site-specific concerns.
Not for every project. But the Code still requires that foundations and support assumptions be appropriate for actual site conditions, which is why a geotechnical report often becomes the practical way to support the design.
Because different parties are responsible for different parts of the project. The city focuses on permit review, the structural engineer focuses on design assumptions, and the designer focuses on coordination. That is why geotechnical input may become important at more than one stage.
You can, but that often leads to delays if the project clearly depends on site-specific geotechnical conditions. In those cases, waiting may simply move the problem later into the project.
Projects involving additions, basement lowering, underpinning, retaining walls, slopes, uncertain fill, groundwater concerns, or non-standard support assumptions are among the most likely.
Yes. The same geotechnical report may support permit review, structural design, construction planning, and project coordination at the same time.
That does not always mean it will not be needed. It may simply mean the project has not yet reached the stage where the geotechnical assumptions are being tested.
The safest approach is to assess the project early and determine whether it depends on site-specific geotechnical assumptions. If it does, addressing the report early is usually more efficient than waiting for someone to raise the issue later.